−78%risk index (FMEA)Sonae MC · Maia distribution centre
Built on site with one of Portugal's largest retail players.
Installed at the Maia distribution centre and integrated into daily operations. In 20 days of pilot: 410 trucks docked, waiting time down from 14.5 to 5.7 min and risk index −78%.
View the case